| July 2007 |
Roof |
Complete tear off and replaced with 35 yr. architectral shingles |
Jan 2008 |
Toilets |
Replaced both toilets with Kohler Wellworth Toilets. |
| Feb 2008 |
Wood flooring |
3/4" solid oak hard wood flooring installed in the living room, dining and hallway of the Main level. |
| June 2007 |
Home stereo system |
All incoming wiring from the outside (ie, cable, phone, satelite) have been run through the attic and walls. No un-neccessary wires attached to the outside of the home.
Satelite installed on side of home to preserve integeity of roofing stucture.
A home theater access panel is wired to the hallway cabinet, to stremline all the electronic components.
Many updates including speaker jacks in living room, and bedrooms. In wall speakers in dinning area. . . |
| June 2007 |
Ceiling fans |
Hunter ceiling fan installed in Living room. A Reiker Ceiling fan with heater is installed in back bedroom for heating efficiency. |
| 2007-2008 |
Painted |
Every room was professionly painted. |
| 2007-2008 |
Garden\Landscaping |
Extensive landscaping done to front of duplex (for benefit of both units), and extensive landscaping done to this unit's back yard and side yard. Brick sidewalks added to front entrance area and side patio landing. |
| June 2007 |
stereo cabinet |
Custom made, built in oak cabinet made for home theater system. |
| May 2008 |
Deck |
Repair of joists, and completely new decking, railing and stairs. |
|
|
|